Production costs and times for differently sized cannula batches
Cannulas (n) | Estimated print time | Print cost | Estimated time for assembly, cut and validation | Total cost (€) |
---|---|---|---|---|
1 | 11 min | 4 | 0.3 | |
5 | 50 min | 0.02 | 20 | 1.52 |
10 | 1 h 40 min | 0.04 | 40 min | 3.04 |
20 | 3 h 15 min | 0.08 | 1 h 20 min | 6.08 |
40 | 6 h 30 min | 0.17 | 2 h 40 min | 12.17 |
50 | 8 h | 0.21 | 3 h 20 min | 15.21 |
100 | 16 h | 0.4 | 6 h 40 min | 30.4 |
Total cost includes the price of the steel guides. All costs are expressed in euros.